Installation training for UPVC windowsMonday 18, Jun 2018
Installation training for UPVC windows
Considering the development of UPS windows in the country as well as the number of manufacturers and the presence of questions and uncertainties in the field of profile production, window installation, window installation as well as technicians and workers in manufacturing and installation sectors. Designed solely to improve the quality of their workmanship and promote it, as well as the satisfaction of the people and the Lord, Datis Commerce Industrial Group is committed to leveraging what it has experienced and to deliver to others. But also to improve the quality of the window in the construction and installation to the benefit of compatriots and the satisfaction of Peru Dgar be believers.
A: (first measurement accuracy)
Occasionally, a person measuring the distance from the repeater to the nearest equivalent meter would make a mistake of 1010 mm to 1100, the manufacturer recommends that the measurement must first take into account these instructions when measuring in width and height. Measuring the location of windows and doors, first measure the width and then the height. Secondly, it must measure both the width and the height from three points, for example, on the map.
In the example above, which seems to me to be the wrong measurement after measuring all three dimensions together, repeating this measurement error. This is why we think that these two parts are the best impression because when constructing and installing the subframes that are supposed to be installed on the windows because of the height of these subframes, Wall mounted on these subframes welded to experience approximately 5mm in the middle Shows size. So we prefer this size over low and high. And now that we have made sure that we have chosen the smallest size, both in height and height, the dimensions we have illustrated may be mistaken when reading the meter, namely the number 1012 reads 1120. Always keep this in mind when reading the meter, first read the size in centimeters, ie 101 cm, and then look at how many millimeters have passed 101 you see 2 millimeters skipped then write 2 millimeters next to 101 2-101 that way you will never go wrong in reading.
We note that you use the smallest dimensions to be executed, and also note the width and then the height when recording sizes. And this method must be implemented universally so that changing the width and height does not make a mistake.
As you probably know, the upvc window is totally 6mm when you build it, and if you don’t select this small number, you practically lose the window or door position when you select a larger one, which means the middle The windows should be pushed through the width section. And when installing, you have to change the hinges backwards, which is a non-standard job. And if that is the case, Espanyolite’s emails will hit the Locking Plates or the pop-up edge of the Locking Plates will hit.
B: Measurement accuracy in door and window designs
Measurements should be taken into consideration when designing doors and windows. Because new architectures use false ceilings in kitchens, bedding or dining areas at the top of the window perform various forms of plastering, such as curtains at the top of the bedroom windows and catering to the desire. Hide the curtains and also in the kitchens to defeat the design of the ceiling and the lighting of the ceilings, all of which may occur after the measurements. Ask the project engineer if they have a design for the curtain or lower ceiling. Or not and after making sure you are the last designer Once a week and the changes made to measure if your project engineer design changes announced by considering the inscription on the top of the window from the ceiling be rejected. Many of the incidents that have occurred while performing the metering work have resulted in false ceilings, causing the windows to fall into the false ceiling, causing overall project damage.
Another frequently used measure of concern is project kitchens, which design windows pop-ups to measure when the meter enters the kitchen (mostly for renovation projects) with no sinks or sinks. After installing the pop-up valve, it will hit the lion’s head, causing the employer to be angry. Then you should pay close attention to these when measuring, and consider your sensitivities, ask the building engineer, then design, and maybe suggest. Giving sliding window on kitchen sink or in writing Design the lower part of the window so that it does not pass through the valve when opening the window.
A: Harmonic accuracy of measurement of building windows
Metering Note When considering the size of a project, take into account the overall design of the building, especially when measuring from an apartment unit.
Considering the design of windows of other floors
2- Attention to the color of the overall glass of the building
3. Pay attention to the color of the building’s overall windows
4- Attention to the same unit design that should apply all the above mentioned features in its design, otherwise, by ignoring any of the above, you will have to replace the built windows.
5. Highly incorrect when designing doors and windows The doors and windows are made incorrectly, and the customer says I wanted to open the balcony or vice versa that was incorrect, which is another mistake that requires careful measurement. Have enough in design.
Now that we can come up with standardized and coordinated definitions and implement them all in order to eliminate all errors in the above, we will serve you some tips.
Basically, architectural engineer shows the exterior of renovation projects in the types of painting renovation projects on the door and window maps, so when considering a map for window and door typing consider the map images. The typing provided by the employer will be different from the measurement harvest map. Since the meter always measures the dimensions of the window and door installation from inside the building, so pay attention to these tips.
1. All maps provided by the viewfinder are from the pop-in door and window to the viewfinder or designer, meaning that the door and window hinges are always responsible for the measurements when measuring in front of the viewfinder.
2. Whenever the person in charge of the measurement wants to determine the direction of the pop-up door or windows, the hinges must be placed in front of his or her eyes. The mark is shown to indicate the direction of the triangle in front of the handle and it is necessary to inspect and approve all maps with the employer or employer’s representative after designing the doors and windows and setting the pop-up mode.
3. When using reconstruction profiles
(Renovation) and pop-up window (Sach) and pop-up door (Door Sach) or fixed middle profile (Mullion) and profile (Fram) Remember to use the following window frame
*f the window frame of the profile
The frame created is exactly the executable dimension that will be the same as the captured one.
* If frame profiles of profiles
Sach or DoorSach or Mullion are made, only mention the profiles mentioned in the Removals section, and never add a numeric size to the 4cm edge of these three profiles that are larger than the window installation location or larger. Leave it to the person implementing the project to always have the responsibility of one person and not add this 4cm to the map because most or both will add 4cm or none that causes It will shrink or enlarge the window.
* If the window frame orientation from the profile
Renovation or restructuring is also used to select these profiles for consideration only to add this 9cm edge to the profile by the executive.
* When using round profile, round profile dimensions will be deducted from the dimensions of the window by the measurement or designer and only the dimensions of the window being executed or notified to the company for construction and explained in the map provided to the company in the comments section. At the desired locations on the map the round profile needs the desired height.
In this case, it is specified that between the two windows, a number of round profiles should be set at a height of 1200, and when sending these two pieces of windows, one round pipe will be sent. In the figure above, the window width is 2275 cm, which will be the sum of the window widths (only if the window frame is of the type
Ordinary frames or slider frames can be used round profiles) If the number of these round profiles is more than one, the meter must first determine the location of the round profiles in consultation with the client and then determine the size of the windows.
It is better to measure this in the following example.
[Three Window Dimensions = Two Round Tubes Width – Overall Dimensions of Window Placement]
2840 = 150-290
Width of each window 947 = 2840 3 3
Now if we run the 947 dimensions to make the window itself, we reduce the width of each window to 6mm when welding, which converts 947 to 941, because after closing these three windows between two round tubes, we finally have to cross-cut. Not more than one centimeter further.
Once in control, we aggregate these dimensions together to see what the total new dimensions of each window (941 mm) will be. [(941 28 2841 = + 2823) +150] = 2973 which shows the sum of window widths of 2973 -2990 = 17 mm which can be obtained when the window and pipes must represent a maximum of 1cm after joining. Executing windows For example, add 2mm to each window, which ends up 11mm in width, and 941mm in width, making 943 executable, which then becomes the sum of the dimensions [(943 28 3 = 2829) +150 ] = 2979 We’ll find an 11mm clearance to the width of the window placement, ie 5.5mm on each side, which will be filled with silicon and foam Getting rid of this formula above can be controlled before making windows, and we can do even less with this.
* Responsible for designing the doors and windows and precisely measuring the location of installation, all drawings with the popup modes (left popup) or (right popup) described in the previous pages or on the balconies with door controls Have the client sign out to the outside or inside the pop-up to avoid mistakes.
* Responsible for metering When measuring projects, take a close look at the status of the installation of windows and doors, especially the kitchen and false ceilings and ceilings as we have mentioned, and by designing inscriptions for curtains and inscriptions or sliding windows for kitchens. (Windows above kitchen sink) Skip this.
We make the designs so that the parts are always at the standard level so that after some time due to the heavy pressure of the double-walled glass, there is no regrowth in the pan (it should be noted that each square meter of glass 4 and 6, 28 kg and each square meter of glass 6 and 6 , Is 30kg).